Free CHST practice test, sorted by blueprint domain
Facts read in BCSP's Credentials At-A-Glance and 2 other documents listed under Sources
This CHST practice test has 30 questions, each tagged with the CHST5 domain it belongs to. Choose an option and a short rationale opens under every choice, the one you picked included. No account, no locked sections.
When one area keeps costing you points, filter by its domain chip and work through that set on its own.
30 questions on construction site safety
0 of 30 done · 0 right
Hazard control · 36.6%1 / 30
A carpenter fastens a temporary 2×4 handrail tight against a stairwell wall so there is no gap for a hand. What does 29 CFR 1926.1052(c) require?
Pick the option you would mark on test day. The choice stays fixed, and every option then explains itself.
A rail height of 42 in instead of a gap
42 inches is the guardrail top-rail height; changing height does nothing about the missing hand clearance.
A rail flush against the wall
A rail tight to the wall cannot be gripped at all, which defeats the purpose of a handrail.
At least 1 in of clearance behind the rail
One inch is too tight for fingers to close around the rail; the stairway rule for temporary handrails sets 3 inches.
At least 3 in of clearance behind the rail
A temporary handrail needs at least 3 inches between rail and wall so a hand can wrap around it and hold on.
Hazard control · 36.6%2 / 30
Workers handling a solvent whose exposure limit carries a 'Skin' notation wear cotton gloves that become soaked. Air sampling shows exposure below the PEL. What is the MAIN concern?
Skin absorption that air monitors miss
A 'Skin' notation flags a chemical that passes through skin in meaningful amounts, and soaked cotton gloves hold it against the hands; skin absorption is a dose that air monitors miss entirely.
Eye irritation from the solvent vapor
Vapor levels are already under the PEL, and eye irritation is not what a skin notation warns about.
Ingestion from eating in the work area
Nothing in the scenario mentions eating at the work area; the soaked gloves point to direct skin contact as the uncontrolled route.
Risk is controlled below the PEL
The PEL addresses inhalation only, so being below it says nothing about solvent absorbed through wet gloves; the risk is not controlled.
Hazard control · 36.6%3 / 30
A testing contractor will X-ray pipe welds on site with a gamma source and posts a restricted boundary. What must other trades do during the shots?
Work inside it 6 ft from the source
Gamma rays from an industrial source travel far past 6 ft; the boundary distance is set from measured dose rates and is usually much larger.
Remain inside it with lead aprons on
Lead aprons made for medical X-ray do little against the high-energy gamma rays of an industrial radiography source.
Enter it if they wear dosimeter badges
A dosimeter records dose without reducing it, and other trades are not trained or authorized to work inside the radiographer's boundary.
Stay outside it until the area is cleared
The posted boundary marks where dose rates exceed the limit for people who are not radiation workers, so everyone else stays outside it until the radiographer finishes and the area is cleared.
Hazard control · 36.6%4 / 30
The anti-two-block device on a telescopic boom crane stops working on Monday morning, and parts are on hand. What does 29 CFR 1926.1416(d) require?
Use the listed alternative; repair within 7 days
The anti-two-block device is a Category I operational aid, so the crane may keep working only with the temporary measures the standard lists, and with parts on hand the repair is due within 7 calendar days.
Stop lifting until the device is repaired
Stopping lifting is not what the standard requires: it lets the crane keep working once its listed temporary measures, such as a marked cable and a spotter, are in place.
Use the listed alternative; repair within 30 days
Thirty days is the deadline for Category II aids such as load indicators; the anti-two-block device is Category I, so the listed alternative buys only 7 days.
Keep lifting and fix it at the annual inspection
Waiting for the annual inspection leaves the crane without two-block protection for months; the standard sets a repair deadline measured in days.
Hazard control · 36.6%5 / 30
A boom lift will be used on a sloped driveway. What does 29 CFR 1926.453(b)(2) require before the platform is raised?
Set brakes, pad outriggers, chock wheels
Before the platform goes up the aerial lift rule calls for set brakes, outriggers on pads or a solid surface, and wheel chocks when the lift stands on an incline and chocks can be placed safely.
Set brakes, pad outriggers, skip chocks
Skipping chocks leaves a lift that can creep on the slope even with brakes set and outriggers padded; chocks are required on an incline.
Park across the slope instead of chocking
Parking across the slope instead of chocking does not remove the chock requirement and adds side-tipping risk when the boom swings.
Raise the boom first, then set brakes
Raising the boom shifts the center of gravity, so the unit is secured before elevation, never after.
Hazard control · 36.6%6 / 30
Overnight freezing rain coats the walkways between the parking area and the site trailers. What should the site do FIRST, before the shift arrives?
Issue boot traction cleats at the gate
Cleats are PPE, the last line of defense, and they leave the ice in place for anyone without them.
Remove the ice and apply sand or deicer
Clearing the ice and treating the walkways removes the hazard itself, the top of the hierarchy, and it can be finished before anyone walks there.
Coach workers to take short, flat steps
Walking technique is an administrative measure that depends on every worker remembering it on every step.
Post slippery-walkway signs at the gate
Posting warning signs leaves the ice where it is and relies on people changing how they walk.
Hazard control · 36.6%7 / 30
A contractor will demolish a fire-damaged two-story masonry building. Before any demolition starts, what does 29 CFR 1926.850(a) require?
An EPA asbestos clearance for the structure
Asbestos inspection falls under separate EPA and OSHA asbestos rules, and the demolition paragraph names no EPA clearance.
An engineering survey by a competent person
Before demolition starts, a competent person must survey the structure's condition, including the chance of unplanned collapse, which fire damage makes even more pressing.
Notice to OSHA 10 days before demolition starts
The 10-working-day demolition notice comes from EPA's asbestos NESHAP and goes to EPA or the state agency, not to OSHA.
A PE-stamped demolition plan for the building
The demolition rule asks for a survey by a competent person, not a plan sealed by a professional engineer.
Hazard control · 36.6%8 / 30
Painters will spray a flammable lacquer inside an enclosed room, and a combustible-gas meter will be used to verify the ventilation. Under NFPA 33, the NFPA standard for spray application, ventilation must keep vapor concentrations below what level?
25% of the UEL
The upper explosive limit is the wrong end of the flammable range; 25 percent of the UEL can already sit inside the explosive range.
50% of the UEL
50 percent of the UEL, the upper explosive limit, usually lies inside the flammable range, so it gives no margin against ignition.
25% of the LEL
NFPA 33 sizes spray-area ventilation to keep flammable vapor below 25 percent of the lower flammable (explosive) limit, the LEL, leaving a margin for richer pockets near the gun.
10% of the LEL
10 percent of the LEL is the confined space threshold for a hazardous atmosphere, a different rule from spray-area ventilation.
Hazard control · 36.6%9 / 30
A crew will core-drill and saw-cut a slab in an occupied building where conduits may be embedded. What does 29 CFR 1926.416(a)(3) require before the work begins?
Rely on the original plans for conduit
Original plans often miss later changes, which is why the rule calls for inquiry, observation or instruments rather than relying on drawings.
Find out if live circuits run in the slab
Before work begins the electrical rule requires the employer to determine, by inquiry, observation or instruments, whether energized circuits sit where the work could contact them.
Wear rubber gloves and keep cutting
Gloves do not replace locating the circuits, and ordinary rubber gloves are not rated electrical protection for keeping on cutting.
Cut first and stop if sparks appear
Sparks mean the blade has already hit a live conductor; the check has to come before cutting, not from it.
Hazard control · 36.6%10 / 30
Workers clear a 1.5-cubic-yard concrete mixer's loading skip by hand with shovels while it is raised. What does 29 CFR 1926.702(b) require?
Long-handled shovels for hand clearing
Longer handles still put workers under or beside the raised skip; the standard calls for a mechanical device in place of hand clearing.
A warning horn before the skip rises
A horn warns before the skip moves but does nothing for people clearing material by hand beneath it.
A mechanical device to clear the skip
Mixers with loading skips of one cubic yard or more must have a mechanical device to clear the skip, plus guardrails on each side, so no one works under or in a raised skip.
A spotter watching the skip
A spotter can watch, but the worker is still in the path of a skip that drops or shifts; the rule removes hand clearing altogether.
Hazard control · 36.6%11 / 30
Bricklayers repointing mortar want their frame-scaffold platform, 20 feet up, set 16 inches from the wall to give them room. What does 29 CFR 1926.451 require?
Move it to within 3 in of the wall face
Three inches is the limit for outrigger scaffolds, not for a frame scaffold working against a wall.
No change if a toeboard is added on that side
A toeboard stops falling tools and materials but does not keep a worker from stepping into the gap at the inner edge.
No change; up to 18 in is permitted
No change is permitted for this work: the 18-inch allowance covers only plastering and lathing, and repointing mortar falls under the 14-inch limit.
Move it within 14 in or guard the inner edge
A platform's front edge may sit no more than 14 inches from the face of the work unless guardrails or personal fall arrest protect that inner edge, so 16 inches needs one or the other.
Emergency and incidents · 19.9%12 / 30
A shackle breaks during a lift, dropping the load. How should the broken pieces be handled for the investigation?
Tag, bag, and keep them unaltered for analysis
The fracture faces carry the evidence of overload, fatigue or a material defect, so the pieces are tagged, bagged and kept unaltered for a lab or metallurgist.
Photograph them, then discard the broken parts
Photographs alone cannot replace the parts, and discarding them destroys the physical evidence a lab needs to examine.
Clean the fracture faces before photos
Cleaning the fracture faces strips corrosion, paint and deposits that help show how long a crack had been growing before the break.
Fit the broken pieces back together
Fitting the broken pieces back together crushes the fine features an analyst reads on the fracture.
Emergency and incidents · 19.9%13 / 30
An electrician receives a 277-volt shock from a mislabeled circuit. He says he feels fine and wants to get back to work. What should the supervisor do?
Treat it as first aid and let him continue
Calling it first aid skips the medical check and assumes there is no injury before anyone qualified has looked.
Watch him for an hour, then decide
A supervisor cannot detect a heart rhythm problem by watching, and waiting only delays the evaluation.
Let him work if no burns can be seen
Electrical injury is often internal, so the lack of visible burns does not show the shock was harmless.
Send him for medical care now
Current can injure the heart and deep tissue without visible burns, and rhythm problems may not show at once, so a significant shock means prompt medical care and evaluation.
Emergency and incidents · 19.9%14 / 30
A worker fell from a ladder set on mud. He had taken a sedating cold medicine that morning, which made him less alert but did not by itself cause the fall. How should the medicine's effect be classified?
An unrelated factor
The medicine made the worker less alert, so it is tied to the event and is not an unrelated factor.
The root cause
A root cause is the underlying system failure that, once fixed, prevents recurrence, such as having no fitness-for-duty check; the drowsiness alone is not that.
A contributing factor
The drowsiness from the medicine made the fall more likely without causing it on its own, which is exactly what a contributing factor is.
The immediate cause
The immediate cause is the condition at the moment of the fall, here the ladder set on mud.
Emergency and incidents · 19.9%15 / 30
One floor of an occupied building is being gutted. On day one the crew wants to remove the fire doors and rated walls that separate the work area from the occupied floors. Under 29 CFR 1926.150(f), what applies?
Keep them in place during night shifts
The rule has no shift-based schedule; the cutoffs stay in place day and night until the work itself requires removing them.
Keep them until the work requires removal
In buildings under alteration or demolition, fire cutoffs stay in place until the operations make removal necessary, so they cannot all come out on day one.
Remove them if extinguishers are added
Extinguishers do not stop fire and smoke from spreading the way rated doors and walls do, so adding them cannot substitute for the cutoffs.
Remove them once occupants are warned
A warning does not protect people on occupied floors from a fire that starts in the work area.
Emergency and incidents · 19.9%16 / 30
A release on site of an extremely hazardous substance exceeds its reportable quantity and could affect the neighborhood. Besides the National Response Center, whom does EPCRA Section 304 require the contractor to notify immediately?
The city building department and police
Police may answer a 911 call, but EPCRA names the state and local emergency planning bodies, not the building department or police, as the required recipients.
The project's insurance carrier
Telling the insurance carrier is a business step and satisfies no federal release-reporting duty.
State and local emergency planners
EPCRA Section 304 requires immediate notice of a reportable release of an extremely hazardous substance to the State Emergency Response Commission and the Local Emergency Planning Committee for each area likely to be affected, with a written follow-up.
OSHA's area office within 8 hours
OSHA's 8-hour clock is for reporting a work-related fatality; it has nothing to do with a chemical release reaching the community.
Emergency and incidents · 19.9%17 / 30
Miners in a tunnel could be trapped by smoke or gas from a fire at the shaft. What does 29 CFR 1926.800 require for these workers?
Self-rescuers at the work stations
Approved self-rescuers must be immediately available at underground work stations, so each worker can put one on within seconds if smoke or gas cuts off the way out.
Escape hoods stored at the surface
Equipment kept at the surface cannot help workers who are cut off underground; it has to be where they work.
An SCBA carried by the foreman
An SCBA carried by the foreman leaves the rest of the crew unprotected; every exposed worker needs a device within reach.
Dust masks issued to each worker
Dust masks filter particles but supply no oxygen and give no protection against carbon monoxide or fire gases.
Safety program · 22.5%18 / 30
During an inspection, an OSHA compliance officer finds an imminent danger in a deep unshored trench, and the contractor refuses to pull its workers out. What can OSHA do to stop the work?
Ask local police to arrest the foreman
Local police do not enforce federal OSHA standards, and OSHA itself has no arrest power.
Seek a federal district court order
The OSH Act gives OSHA no power to close a site on its own; for an imminent danger it asks a U.S. district court for an order restraining the work.
Padlock the site on the officer's authority
Compliance officers have no authority to padlock or close a workplace; only a court can order the work stopped.
Issue an on-the-spot fine and leave
There is no on-the-spot fine: citations and penalties come later from the Area Office, and leaving does nothing for workers still in the unshored trench.
Safety program · 22.5%19 / 30
A small contractor is thinking about asking OSHA's On-Site Consultation Program for a free hazard assessment of its yard. Which statement about the program is correct?
It begins after an OSHA citation
Employers request a visit voluntarily, usually with no inspection in sight; it does not begin after an OSHA citation as a follow-up.
Serious hazards found need not be fixed
Employers who use the service agree to correct the serious hazards the consultant identifies within an agreed time.
It is separate from enforcement
On-Site Consultation is a free, confidential service separate from OSHA enforcement; consultants issue no citations or penalties.
Findings go to OSHA enforcement
Consultation results stay with the employer and are not passed to enforcement inspectors, which is what makes the service safe to request.
Safety program · 22.5%20 / 30
At the end of each project, a GC wants its subcontractors' safety performance on that job to influence future bids. What practice BEST does this?
Rate each sub at closeout for prequal
Scoring each subcontractor's safety performance at closeout and feeding the score into prequalification ties what happened on this job to future award decisions.
Use each sub's next EMR letter
The EMR letter is a delayed, company-wide figure driven by insurance claims, so it says little about how a sub performed on this particular job.
Ask subs to rate themselves
Asking subs to rate themselves produces scores that are neither independent nor verifiable and tend to be favorable; the GC's own observations should count.
File the safety logs in project archives
Filing the safety logs in archives keeps records but links nothing to future bidding, which is the point of the GC's request.
Safety program · 22.5%21 / 30
A carpenter sprains an ankle playing in an after-hours company softball game that is voluntary and held at a city park. He needs prescription medication. Is the case work-related for OSHA recordkeeping?
Yes; the company sponsored the game
Sponsorship alone does not make a game part of work; what decides the case is that playing was voluntary.
No; recreational activity is excluded
An injury that results solely from voluntary participation in a recreational or fitness activity is excluded from work-relatedness, so the case is not recorded even with a prescription.
No; a prescription counts as first aid
A prescription is medical treatment beyond first aid and would make a work-related case recordable; this case is not recorded because it fails work-relatedness.
Yes; prescription drugs make it recordable
Prescription medication is a recording criterion only once a case is work-related, and this one fails that first test.
Safety program · 22.5%22 / 30
A carpenter injured on December 20 is still off work when the 300A summary is prepared in January. How should the days away be recorded?
Last year's log, with an estimate
The case stays on the log for the year of the injury, and if the worker is still off when the summary is prepared, the employer estimates the total days away and updates the entry later.
Hold the 300A until he returns to work
The 300A cannot be held for one worker: it is certified and posted from February 1 to April 30 on schedule, using an estimate.
The new year's log, once he returns
Moving the case to the new year would misstate both years' records; the injury date fixes which log it goes on.
Split across both years' logs
Days away are not divided between logs; the whole case belongs to the year in which the injury happened.
Safety program · 22.5%23 / 30
A site's inspection program grades findings A, B or C by potential severity. An inspector finds a scissor lift in use on an upper deck with its tilt alarm and pothole guards bypassed and rates it Class A. How should it be handled?
Fix it within the weekly correction cycle
A weekly cycle suits lower-severity items; a lift in use with its tip-over protection bypassed cannot wait days.
Add it to the next monthly audit
Deferring a Class A hazard to the next audit leaves people exposed for weeks.
Log it for the safety committee to rank
The severity has already been rated; routing it to a committee adds delay and no protection.
Control the exposure immediately
A Class A finding could cause death or serious injury, so the exposure is controlled at once, by taking the lift out of service, before the permanent repair is scheduled.
Safety program · 22.5%24 / 30
Two similar contractors each had $100,000 in workers' comp losses over the rating period. Contractor A had one $100,000 claim; Contractor B had twenty claims of $5,000 each. Whose EMR will likely be hurt more?
Neither; EMR excludes medical claims
Medical claims enter the EMR alongside lost-time cases, so the idea that EMR excludes them is wrong.
B's; frequency drives the EMR more
The EMR formula counts the first part of every claim at full weight and discounts the excess of large claims, so many small claims raise the modifier more than one big claim of the same total.
A's; one large claim weighs the most
Above the split point a large claim is discounted, so the single $100,000 loss weighs less than twenty small ones.
Neither; equal losses, equal EMRs
Equal dollar totals do not give equal modifiers because the formula separates primary and excess losses.
Leadership and training · 21%25 / 30
A contractor is starting a peer-observation behavior-based safety process. Which practice MOST protects workers' trust in it?
Supervisors carry out the observations
A peer process relies on coworkers observing each other; having supervisors carry out the observations makes them feel like inspections and erodes trust.
Results are posted by crew each week
Posting results crew by crew each week invites ranking and blame, which pushes crews to hide at-risk behavior instead of discussing it.
Observers record names for targeted retraining
Recording names turns peer observation into surveillance, so workers act differently when watched and observers soften what they record.
Data are anonymous and not used for discipline
Peer observation works only when workers trust that what an observer writes down will not be used against them, so the data are anonymous and kept out of the discipline process.
Leadership and training · 21%26 / 30
A contractor wants to replace classroom respirator instruction with a self-paced online module, with no live person available to answer questions. Under OSHA's interpretations on online courses, what is missing?
Nothing, if workers pass the module's final quiz
A passing quiz score shows recall, not that a worker can put on and check a respirator, and it still leaves no one to answer questions.
A rule to repeat the module every six months
Respirator training is already required yearly, and repeating a flawed module more often adds neither a trainer nor practice.
A qualified trainer and hands-on practice
OSHA accepts computer-based training only when workers can put questions to a qualified trainer and, for respirators, practice donning and seal checks with the actual equipment.
A certificate signed by each worker
A signed certificate documents completion; it does not supply the missing interaction or the hands-on practice.
Leadership and training · 21%27 / 30
A contractor has detailed procedures, regular audits and plenty of statistics, but safety is driven by management, treated as compliance with rules, and workers rarely propose improvements. On the Hudson safety culture ladder, which level is this?
Generative
In a generative culture safety is part of how everyone works and workers keep looking for improvements, the opposite of what is described.
Pathological
A pathological culture cares about safety only to avoid being caught, so it would not keep detailed procedures and regular audits.
Calculative
At the calculative rung the organization has systems, audits and plenty of data, but safety is imposed by management and treated as compliance, with little input from the workforce.
Proactive
At the proactive rung the workforce starts to take the initiative and values drive safety, which this contractor has not yet reached.
Leadership and training · 21%28 / 30
A subcontractor's HazCom training covers only label elements and pictograms. Under 1910.1200(h)(3), which required training element is missing?
Methods to detect a release of the chemicals
HazCom training must cover the methods and observations workers can use to detect the presence or release of a hazardous chemical, such as monitoring, odor or visible signs, along with the hazards, protective measures and program details.
The supplier's trade-secret formulation data
Trade-secret formulation data can be withheld from the SDS under set conditions and is not part of required worker training.
Purchase and inventory records for each product
Purchase and inventory records support the chemical inventory the employer keeps, but workers do not need them in training to handle the products safely.
The OSHA penalty schedule for HazCom
The OSHA penalty schedule concerns the employer's liability and gives workers nothing they need to protect themselves; the training rule does not list it.
Leadership and training · 21%29 / 30
On its last highway project, a contractor had three struck-by incidents during night paving, all tied to poor lighting and shifting work zones. It is now bidding a similar night project. What is the BEST use of those lessons?
Watch whether the same problems recur first
Waiting for the same incidents to happen again ignores evidence the contractor already holds.
Reuse the prior project's traffic plan unchanged
The old traffic plan is part of what failed, so reusing it repeats the conditions behind the three incidents.
File the old investigation reports for reference
Filing the old investigation reports keeps the knowledge on a shelf where it never reaches the new project's planners or crews.
Build the findings into the new project plan
Lessons learned pay off only when they change the next job, so lighting, traffic control and work-zone layout are designed into the new plan and bid from the start.
Leadership and training · 21%30 / 30
Crews shrug off the risk of the grinding they do every day but worry intensely about a rare crane collapse. Which risk-perception factor BEST explains their low concern about grinding?
Involuntary exposure to the hazard
Involuntary exposure makes a risk feel larger, and the crews choose and control their own grinding.
Familiarity and a sense of control
Hazards people face every day and feel in control of seem smaller than they are, so routine grinding draws little concern despite constant exposure.
Low probability of being exposed
The crews grind daily, so exposure is near certain and cannot explain their low concern.
High dread of the possible outcome
Dread raises perceived risk; it explains the fear of the crane collapse, not the calm about grinding.
What your percentage here does and does not tell you
Your result on this page simply counts correct answers. BCSP keeps the real exam's cut score to itself; a panel of credential holders sets the standard, and the board can change it without notice. For a sense of how candidates fare, 61.8% passed between October 2023 and September 2024, according to BCSP's annual report.
What a practice set does show well is the gap between domains. If you miss hazard-control questions, that weakness costs you most on the real form, since it is the heaviest domain.
Working at exam pace
BCSP's 2018 guide described the form as 200 questions; the current pages give only the time limit, 4 hours. That leaves just over one minute for each item, so a long calculation or a standard you cannot place is worth flagging and leaving for a second pass.
The same 2018 guide notes that 10 to 15% of the questions on BCSP exams are experimental and do not count. A stretch of unfamiliar items may be tryouts, but there is no way to tell, so give them the same care as the rest.
Who wrote these construction questions
The set was written and checked by Newly Certified for study. BCSP had no part in it, and it is not drawn from any live form. The domain names and weights are taken from BCSP's CHST5 blueprint.
Other CHST pages on this site
CHSTWho qualifies, what the exam covers, how it is kept
How many answer choices does a CHST question have?
BCSP's 2018 guide describes four options per question, one of them correct; the board's current pages do not restate it. Each item in this set follows that layout.
Can I use a calculator on the CHST?
The 2018 guide lists an on-screen calculator, or an approved calculator model of your own. Check the board's current calculator list before test day, since models change.